3 thoughts on “Piling by the River Tees c1989

  1. This was all at the time of the Tees barrage & Teesdale development, the south side of the river was piled from Victoria Bridge all the way to the barrage. I assume it was to allow the constant high water level once the barrage was completed? and allow for the buildings to be built right on the riverside.

    Like

Leave a comment

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s